Tuesday, February 8, 2011

Graywater ready for inspection


As we are slowly approaching the finish line, more and more finishes are being completed. One of them are the cabinets. Michael, our cabinet maker made sure, that the panels of doors and drawer fronts have a continuous grain (on all cabinets). This gives the whole cabinetry a coherent look and puts the emphasis on the beauty of the wood- The grain is only interrupted by the narrow gaps and the door hardware. Last week, Abe poured the new curb and the driveway- the street facade is almost done. On the interior, the graywater tank went in and is ready for inspection- see photo.

No comments:

Post a Comment