Monday, November 22, 2010

A stucco safety net




Past Friday, we started with the main building's stucco (The Saturday before, we already did the bathroom box). In order to reduce the risk of cracks in the finish plaster, we applied a self-adhesive fiberglass mesh to the brown coat (after all brown coat cracks have been fixed and the control screeds cleaned and taped). The mesh installs easily- The hardest thing is to get it off the roll though. The stickiness makes it somewhat hard to unroll.
In areas of rough brown coat, we helped a bit with 3M-77 spray adhesive. In one day, we covered a bit more than half the building (the stucco crew actually applied two coats of the 30/30 sand finish on half of the area and one coat to the rest, since it was already getting dark. The subsequent rain on Saturday prohibited us from continuing and the stucco sub will pick up teh work tomorrow. With a bit of luck, they'll be done on Wednesday- if not on Monday after Thanksgiving.
On the inside, the tile work is almost done (except for the backsplash areas and the grouting). Michael, our cabinet sub, started to put in some boxes already and we hope that we'll finish the rough work by Thanksgiving. The doors are on-site and being stained and the solar panel installer will start with the framework tomorrow. On Monday, the garage door installer will then follow suit.

No comments:

Post a Comment