They're finally up- During the past week, the crew of California Green Designs installed the panels, the disconnects (all 3 of them) and the inverter to complete the solar PV installation. Now, we only need to hook it up to benefit from the sun.
On the inside, the cabinetry is taking shape: Michael, our cabinet maker, has installed most of the boxes and is now waiting for the slab fabricator to put on the countertops before he can tackle the finish panels for doors and drawers.